Full display

  • Abstract:
    This part of IEC 62271 specifies the service conditions, rated characteristics, general structural requirements and test methods of the assemblies of the main electrical functional units of a high-voltage/low-voltage distribution substation, duly interconnected, for alternating current of rated operating voltages above 1 kV and up to and including 52 kV on the high- voltage side, service frequency 50 Hz or 60 Hz. This assembly is to be cable-connected to the network, and intended for installation within an indoor or outdoor closed electrical operating area. A Compact Equipment Assembly for Distribution Substation (CEADS) as defined in this document is designed and tested to be a single product with a single serial number and one set of documentation. The functions of a CEADS are: switching and control for the operation of the high-voltage circuit(s); protection of the high-voltage/low-voltage transformer functional unit; high-voltage/low-voltage transformation; switching and control for the operation and protection of the low-voltage feeders. However relevant provisions of this document are also applicable to designs where not all of these functions exist (e. g. equipment comprising only high-voltage/low-voltage transformation and switching and control for the operation and protection of the low-voltage feeder functions or equipment without switching and control for the operation of the high-voltage circuit(s)). NOTE For the purpose of this document a self-protected transformer is considered not as a CEADS, but as a functional unit, designed and type tested to its own product standard IEC 60076-13:2006.
  • Document number:
    IEC 62271-212
  • Issuing date:
    2016-10-01
  • Document type:
    Norm
  • Title:
    High-voltage switchgear and controlgear - Part 212: Compact Equipment Assembly for Distribution Substation (CEADS)
  • Replaces:
    IEC 17C/645/FDIS(2016-06)
  • Author:
    IEC/SC 17C Assemblies
  • Search term:
    AC switchgear and controlgear; Air-break switches; Alternating current; Alternating voltages; Circuits; Consumer substations; Control; Control devices; Definitions; Design; Electrical engineering; Functional units; Fuse combination units; High voltage; High-voltage equipment; High-voltage switchgears; Installations for rated voltages; Isolator switches; Low voltage; Operating conditions; Properties; Protected electrical equipment; Qualification tests; Rated voltage; Rated voltages; Ratings; Shop-assembled; Specification (approval); Substation; Switch-disconnectors; Switches; Switchgear; Switchgear assemblies; Switchgears; Testing; Transformation
  • Application areas:
    05.10 Stromerzeugungs- und Verteilungsanlagen
  • Hazards:
    AB Terminologische Festlegungen in Normen mit Arbeitsschutzbezug; EB Berühren spannungsführender oder leitfähiger Teile
  • ICS:
    29.130.10 High voltage switchgear and controlgear
  • Price:
    320,00 EUR
  • Cross references:
    IEC 60050-441 (1984)<S>; IEC 60050-461 (2008-06)<S>; IEC 60076-1 (2011-04)<S>; IEC 60076-2 (2011-02)<S>; IEC 60076-3 (2013-07)<S>; IEC 60076-5 (2006-02)<S>; IEC 60076-10 (2016-03)<S>; IEC 60076-11 (2004-05){historisch}<S>; IEC 60076-12 (2008-11)<S>; IEC 60076-15 (2015-04)<S>; IEC 60243-1 (2013-03)<S>; IEC 60364-4-41 (2005-12)<S>; IEC 60529 (1989-11)<S>; IEC 60664-1 (2007-04){historisch}<S>; IEC 60721-1 (1990-12)<S>; IEC 60721-2-2 (2012-12)<S>; IEC 60721-2-4 (1987){historisch}<S>; IEC 60947-1 (2007-06){historisch}<S>; IEC 61439-1 (2011-08){historisch}<S>; IEC 62262 (2002-02)<S>; IEC 62271-1 (2007-10){historisch}<S>; IEC 62271-1 AMD 1 (2011-06){historisch}<S>; IEC 62271-200 (2011-10){historisch}<S>; IEC 62271-201 (2014-03)<S>; IEC 62271-202 (2014-03)<S>; ISO/IEC Guide 51 (2014-04)<S>; IEC 60076-4 (2002-06)<G>; IEC 60076-6 (2007-12)<G>; IEC 60076-8 (1997-10)<G>; IEC 60076-10-1 (2016-03)<G>; IEC 60076-13 (2006-05)<G>; IEC 60076-14 (2013-09)<G>; IEC 60076-18 (2012-07)<G>; IEC/TS 60815-1 (2008-10)<G>; IEC/TS 60815-2 (2008-10)<G>; IEC/TS 60815-3 (2008-10)<G>; IEC/TS 60815-4 (2016-10)<G>; IEC 61439-3 (2012-02)<G>; IEC 61439-3 Corrigendum 1 (2013-09)<G>; IEC 61439-4 (2012-11)<G>; IEC 61439-5 (2014-08)<G>; IEC 61439-5 Corrigendum 1 (2015-03)<G>; IEC 61439-6 (2012-05)<G>; IEC 60076-7 (2018-01)<G>; IEC/IEEE 60076-16 (2018-09)<G>; IEC 60076-21 (2018-12)<G>; IEC 61439-2 (2020-07)<G>
  • Cited in:
    DIN EN IEC 60519-1 (2020-12)<GLEITEND>; DIN EN 60519-1 (2017-06); DIN EN IEC 61400-1 (2019-12)<GLEITEND>; DIN EN IEC 61869-13 (2022-03); DIN EN 62271-212 (2017-09); 18/30368751 DC (2018-08-06); 18/30374549 DC (2018-06-28); 19/30352697 DC (2019-01-23); 19/30370675 DC (2019-01-22); 19/30398402 DC (2019-06-27); 20/30413485 DC (2020-02-14); 21/30405603 DC (2021-08-23); BS ISO/IEC 30144 (2020-11-05); BS EN 50673 (2019-03-22); BS EN IEC 61243-1 (2021-11-25); BS EN IEC 61400-1 (2019-04-29); BS EN IEC 61869-13 (2021-07-20); PD IEC/TS 63042-101 (2019-01-29); EN IEC 60519-1 (2020-05)<GLEITEND>; EN IEC 61243-1 (2021-06)<GLEITEND>; EN IEC 61400-1 (2019-04)<GLEITEND>; NF C18-313-1 (2021-06-18); NF C79-631 (2020-05-29); IEC 60519-1 (2020-03)<GLEITEND>; IEC 61243-1 (2021-04)<GLEITEND>; IEC 61400-1 (2019-02)<GLEITEND>; OVE EN IEC 60519-1 (2021-01-01); OVE EN IEC 61400-1 (2020-01-01)
  • Identical with:
    DIN EN 62271-212(2017-09)<IDT>; BS EN 62271-212(2017-01-31)<IDT>; GB/T 40823(2021)<MOD>; DS/EN 62271-212(2017-03-20)<IDT>; EN 62271-212(2017-01)<IDT>; NF C64-471-212(2017-03-15)<IDT>; PR NF C64-471-212<IDT>; SN EN 62271-212(2017-01)<IDT>; OVE EN 62271-212(2017-11-01)<IDT>; UNE-EN 62271-212(2017-10-25)<IDT>; TS EN 62271-212(2017-03-20)<IDT>
  • Update flag:
    Unchanged