- Abstract:The elements of design of this standard shall enable architects, designers and administration to construct fire stations due to the requirements of fire fighting technology. The room design, features, dimensions and guidelines indicated are intended to serve as elements for design from which choices have to be made depending on the local situation. The place of a fire station has to be chosen with regard to all tactical consideration (e. g. rescue period, traffic connection, urban development). The building plot intended for the fire station has to be suitable for construction with regard to its location, form, dimension, altitude and quality and allow for extensions to be made.
- Document number:DIN 14092-1
- Issuing date:2012-04-01
- Document type:Norm
- Title:Fire stations - Part 1: Elements for design
- Replaces:DIN 14092-1(2001-10); DIN 14092-1(2011-04); DIN 14092-2(2001-10)
- Author:Firefighting and Fire Protection Standards Committee
- Search term:Basic domestic facilities; Construction; Cubic measure; Dimensions; Exterior circulation spaces (buildings); Fire brigade; Fire stations; Firefighting; Firefighting vehicles; Floor place requirements; Lighting systems; Outdoor-type plant; Parking spaces; Planning; Real estates; Room utilization; Rooms; Size of room; Space requirement; Specification (approval); Stowage spaces
- Application areas:08.05 Bauwerksteile (Decken, Wände, Treppen, Türen, Fenster, Fußböden und Bodenbelege u. Ä.); 08.25 Gebäudeinstallationen; 08.30 Gebäudebeleuchtungen; 08.35 Ingenieurbau und Ingenieurbauwerke; 35.05 Gestaltung der Arbeitsstätten und -plätze
- Hazards:AC Mess- und Prüfverfahren für die Ermittlung von Belastungen und Gefährdungen; DB Quetschen, Einklemmen; HD Handhabungsfaktoren (Gestaltung und Anordnung von Bedienelementen, Bewegungsraum, Gestaltung und Handhabbarkeit von Arbeitsmitteln, Sichtfeld, Standsicherheit)
- ICS:13.220.10 Fire-fighting; 91.040.10 Public buildings
- Price:99,10 EUR
- Cross references:WHG (2009-07-31)<S>; AbwV (2004-06-17)<S>; ArbStättV (2004-08-12)<S>; DIN 1045-2 (2008-08)<G>; DIN 1045-3 (2012-03)<G>; DIN 1045-4 (2012-02)<G>; DIN 1055-2 (2010-11)<G>; DIN 1986-3 (2004-11)<G>; DIN 14092-3 (2012-04)<G>; DIN 14092-7 (2012-04)<G>; DIN V 18599 Beiblatt 1 (2010-01)<G>; DIN EN 858-2 (2003-10)<G>; DIN EN 1991-1-1 (2010-12)<G>; DIN EN 1991-1-3 (2010-12)<G>; DIN EN 1991-1-4 (2010-12)<G>; DIN EN 1991-1-5 (2010-12)<G>; DIN EN 1991-1-6 (2010-12)<G>; DIN EN 1991-1-7 (2010-12)<G>; DIN EN 1991-3 (2010-12)<G>; DIN EN 1998-1 (2010-12)<G>; DIN EN 62305-1 (2011-10)<G>; DIN EN 62305-3 (2011-10)<G>; DIN EN 62305-3 Beiblatt 4 (2008-01)<G>; DIN EN 62305-4 (2011-10)<G>; ASR A 1.7 (2009-11-10)<G>; ASR A 3.4 (2011-04-29)<G>; ASR A 3.5 (2010-06)<G>; DVGW W 551 (2004-04)<G>; GUV-R 1/494 (1990-07)<G>; DIN 1045-100 (2017-09)<G>; DIN 1986-100 (2016-12)<G>; DIN EN 806-2 (2005-06)<G>; DIN 1999-100 (2016-12)<G>; DIN 4108 Beiblatt 1 (1982-04)<G>; DIN 4108 Beiblatt 2 (2019-06)<G>; DIN EN ISO 7345 (2018-07)<G>; DIN 4108-2 (2013-02)<G>; DIN 4108-3 (2018-10)<G>; DIN 4108-4 (2020-11)<G>; DIN/TS 18599-12 (2021-04)<G>; DIN 4108-7 (2011-01)<G>; DIN 4108-10 (2021-11)<G>; DIN 14011 (2018-01)<G>; DIN EN 1846-3 (2013-11)<G>; DIN 18202 (2019-07)<G>; DIN V 18599-1 (2018-09)<G>; DIN V 18599-2 (2018-09)<G>; DIN V 18599-3 (2018-09)<G>; DIN V 18599-4 (2018-09)<G>; DIN V 18599-5 (2018-09)<G>; DIN V 18599-7 (2018-09)<G>; DIN V 18599-9 (2018-09)<G>; DIN V 18599-10 (2018-09)<G>; DIN V 18599-10 (2018-09)<G>; DIN VDE 0833-2 (2022-06)<G>; DIN EN 752 (2017-07)<G>; DIN EN 1990 (2021-10)<G>; DIN EN 12464-1 (2021-11)<G>; DIN EN 12464-2 (2014-05)<G>; DIN EN 13241 (2016-12)<G>; DIN EN 62561-1 (2017-12)<G>; DIN EN IEC 62561-2 (2019-12)<G>; DIN EN 62561-3 (2018-02)<G>; DIN EN 62561-4 (2018-05)<G>; DIN EN 62561-5 (2018-05)<G>; DIN EN IEC 62561-6 (2018-10)<G>; DIN EN IEC 62561-7 (2018-10)<G>; DIN EN 62305-2 (2013-02)<G>; DIN EN 62305-2 Beiblatt 1 (2013-02)<G>; DIN EN 62305-3 Beiblatt 1 (2012-10)<G>; DIN EN 62305-3 Beiblatt 2 (2012-10)<G>; DIN EN 62305-3 Beiblatt 3 (2012-10)<G>; DIN EN 62305-3 Beiblatt 5 (2014-02)<G>; DIN EN 62561-1 (2017-12)<G>; DIN EN IEC 62561-2 (2019-12)<G>; DIN EN 62561-3 (2018-02)<G>; DIN EN 62561-4 (2018-05)<G>; DIN EN 62561-5 (2018-05)<G>; DIN EN IEC 62561-6 (2018-10)<G>; DIN EN IEC 62561-7 (2018-10)<G>; DIN VDE 0100-710 (2012-10)<G>; BGR 232 (2003)<G>; DGUV Information 207-006 (2020-05)<G>; GUV-R 181 (2003-10)<G>; TRGS 554 (2019-01)<G>; GEG (2020-08-08)<G>; DGUV Information 205-008 (2016-12)
- Cited in:DIN 13049 (2017-08)<GLEITEND>; DIN 13049 (2023-03)<GLEITEND>; DIN 14092-3 (2012-04)<GLEITEND>; DIN 14092-7 (2012-04)<STARR>; DIN 14093 (2014-04)<STARR>; DIN 14097-1 (2018-05)<GLEITEND>; DIN EN 62305-3 Beiblatt 6 (2022-06); AMEV Ersatzstrom (2022); DGUV Information 205-008 (2016-12); DGUV Regel 105-049 (2018-06)
- Update flag:Unchanged